The RIBA Stages Explained for London Commercial and Listed Building Projects
Most refurbishment projects that go wrong in central London don’t fail on site. They fail months earlier, when a lease restriction, a listed building constraint or a neighbour’s party wall rights comes to light after the design is already fixed. Redesigning at that point costs time, fees and sometimes the whole programme.
The RIBA Plan of Work exists to stop that happening. It splits a building project into eight stages, from the first conversation about whether to build at all to the years the building is in use. This guide explains each of the RIBA stages in plain terms, and adds the steps that most guides leave out for London commercial buildings and listed buildings.
What the RIBA Plan of Work is
The RIBA Plan of Work is the framework the Royal Institute of British Architects publishes to organise the briefing, design, construction and use of a building. The current version is the RIBA Plan of Work 2020. It sets out eight stages, numbered 0 to 7, and for each one it defines the outcome the stage should reach, the core tasks and the information that should be handed over at the end.
Three points are worth knowing before you start.
- It is a framework, not a contract. RIBA says the plan is not intended to be a contractual document. Your appointments and building contract set the legal obligations. The stages give everyone a shared language for what should be done and when.
- It works with any procurement route. Traditional, design and build, and management contracts all fit. The route you choose changes who does the detailed design and when the contractor joins.
- Stages can overlap. RIBA acknowledges that some stages overlap depending on procurement. Technical design and construction often run side by side on refurbishment projects.
The 8 RIBA stages at a glance
| Stage | Name | What happens | London commercial and listed building extras |
|---|---|---|---|
| 0 | Strategic Definition | Decide whether a project is the right answer and what success looks like | Lease and title checks, landlord or estate consent, listing status |
| 1 | Preparation and Briefing | Write the brief, set the budget and programme, commission surveys | Measured and condition surveys, listed building survey, appointment of the CDM principal designer |
| 2 | Concept Design | Develop and test design options against the brief and cost plan | Pre-application advice, early talks with the conservation officer, first party wall review |
| 3 | Spatial Coordination | Coordinate the architecture, structure and services into one design | Planning and listed building consent applications, heritage statement |
| 4 | Technical Design | Prepare the information needed to build, tender the works | Building Regulations application, party wall notices, discharge of consent conditions |
| 5 | Manufacturing and Construction | Build the project and administer the contract | Working around tenants and neighbours, recording any historic fabric uncovered |
| 6 | Handover | Practical completion, handover and the defects period | Health and safety file, as-built records, schedule of condition for new lettings |
| 7 | Use | The building in operation for the rest of its life | Planned preventative maintenance, especially for historic fabric |
Stage 0, Strategic Definition
Stage 0 asks a simple question before anyone draws anything. Is a building project the best way to meet the client’s need? A business that needs more space might be better served by reconfiguring its existing floors, taking more space or moving. A landlord might compare a light refurbishment with a full repositioning of the building.
For London commercial property, Stage 0 is also where the legal ground rules are checked. If you hold a lease, alterations will usually need your landlord’s consent through a licence to alter, and anything you add may have to be removed at the end of the term under the dilapidations clauses of your lease. Many West End buildings sit on large estates with their own consent processes. And if the building is listed, that affects almost every decision that follows.
Stage 1, Preparation and Briefing
Stage 1 turns the idea into a brief. The client and design team agree what the project must deliver, the budget, the programme and how success will be measured. Our guide to writing an architectural design brief covers what to include.
This is also the stage for gathering information about the existing building, and on refurbishment projects it is where good projects separate from difficult ones. Typical surveys include:
- a measured survey, so the design starts from accurate drawings rather than old plans
- a condition survey, so the budget allows for the repairs the building actually needs
- a listed building survey where the building is listed, to establish what is historic, what is significant and what has been altered before
- a review of services, structure, asbestos and fire safety, depending on the scope
Health and safety duties start here too. Under the CDM Regulations 2015, the client must appoint a principal designer on projects with more than one contractor, and that appointment should be made early so risks are designed out rather than managed on site.
Stage 2, Concept Design
At Stage 2 the architect develops design options and tests them against the brief, the budget and the constraints found at Stage 1. The output is a concept design, usually with an outline specification and a cost plan.
For central London projects, Stage 2 is the right time to seek pre-application advice from the council. On listed buildings and in conservation areas, an early conversation with the conservation officer is worth more than any amount of redesign later. Historic England advises checking with the conservation officer first whether consent is needed and what might be acceptable.
It is also the stage to identify party wall matters. If the concept involves work to a party wall, new steel bearing into a shared wall or excavation near a neighbour’s foundations, the party wall process needs to be built into the programme now, not discovered at tender.
Stage 3, Spatial Coordination
Stage 3 coordinates the architecture with the structural and building services design, so the spaces, structure and services all fit together. The RIBA Plan of Work 2020 renamed this stage from “Developed Design” to make the point that coordination should be finished before the design is fixed for planning.
If you have ever asked what RIBA stage the planning application is submitted at, the answer is normally the end of Stage 3. RIBA’s position is that applications should be based on the best possible information, which reduces the risk of having to change the scheme after consent.
For a listed building, the listed building consent application normally goes in alongside the planning application. It typically includes drawings, a heritage statement explaining the building’s significance and how the works affect it, and a justification for the proposals. There is no application fee for listed building consent in England, but the time needed to prepare a good application, and for the council to consult on it, should be in the programme. Our guide to what you can and can’t change on a Grade II listed building explains how councils approach these decisions.
Stage 4, Technical Design
Stage 4 produces the information needed to build the project: detailed drawings, specifications and schedules. On a traditional contract, this information is used to tender the works and appoint a contractor. A Building Regulations application is also made at this stage, before work starts on site.
Three things often catch London projects out at Stage 4.
- Party wall notices. Under the Party Wall etc. Act 1996, a party structure notice must be served at least two months before work starts, and a notice for excavation near a neighbour’s foundations at least one month before. Our guide to party wall notice periods explains the timings.
- Consent conditions. Planning and listed building consents often come with conditions requiring details, such as joinery, materials or method statements, to be approved before the relevant work starts.
- Building Regulations dutyholders. Since 1 October 2023, the Building Regulations have their own dutyholder roles. Where more than one contractor will work on a project, the client must appoint a principal designer and a principal contractor for Building Regulations purposes, in writing, before the construction phase begins. The client can certify that the CDM principal designer and principal contractor fill these roles. If the client fails to appoint, the client must carry out those duties itself.
Stage 5, Manufacturing and Construction
Stage 5 is when the building work happens. The contractor builds the project, and the contract administrator manages the building contract on the client’s behalf: inspecting the works, issuing instructions, valuing progress, assessing variations and certifying payments.
On occupied commercial buildings in central London, this stage is often about logistics as much as construction. Works may need to run around trading tenants, restricted delivery times and close neighbours. On listed buildings, opening up frequently reveals historic fabric that nobody expected, and decisions need to be taken quickly with the conservation officer so the programme keeps moving. This is where independent project management and contract administration earn their fee.
Stage 6, Handover
Stage 6 begins at practical completion, when the building is handed over to the client. The defects period follows, during which the contractor returns to put right any defects that appear. The building contract is then concluded.
Good handover information saves money for years afterwards. That includes as-built drawings, operation and maintenance manuals and the health and safety file required under CDM. If you are letting the space to a new tenant, this is also a good moment for a schedule of condition, so the new lease starts from a clear record.
Stage 7, Use
Stage 7 covers the building in use, for the rest of its life. It includes aftercare, feedback on how the building performs and the information that will shape the next project.
For most commercial owners, the practical tool at Stage 7 is a planned preventative maintenance schedule. It is especially important for historic buildings, where small problems like a blocked parapet gutter or failed pointing can become expensive repairs to listed fabric if they are left.
Where London commercial and listed projects get stuck
Most guides to the RIBA stages are written with a house extension in mind. Commercial and listed buildings in central London add layers that a standard checklist doesn’t cover. In our experience, the delays usually come from one of these.
- Consent from the landlord or estate arriving late because it wasn’t requested at Stage 0.
- Surveys skipped at Stage 1 to save fees, so the design is based on old drawings or assumptions about the structure.
- No early conversation with the conservation officer, leading to a refused or heavily conditioned listed building consent.
- Party wall matters left until tender, pushing back the start date by the notice period or longer if surveyors need to agree an award.
- Consent conditions not discharged before the relevant work starts, which can stop work on site.
Each of these is avoidable if the right advice is in place at the right stage, which is why it helps to work with a team that covers surveying and architecture together.
How the RIBA stages work in practice
At 16 to 20 Shorts Gardens in Covent Garden, F&T led the design team from concept to completion on a £2.4 million, 60 week project that converted a Victorian warehouse into five offices and replaced the lifts. At 35 Cranbourne Street, we acted as architect, principal designer and contract administrator on a £1.45 million scheme that added a fourth floor mansard extension and new residential units above a restaurant, achieving BREEAM Very Good.
On listed buildings, the early stages matter most. At 26 Rupert Street, a Grade II listed building in the West End, F&T prepared the listed building consent and Building Regulations drawings, then managed the tender, contract administration and project management, keeping the original floors, panelling, doors and windows.
Work with one team across every stage
The RIBA stages work best when the advice at each stage joins up with the next. Fresson and Tee provides architectural services in London alongside building surveying, historic building conservation, party wall advice, principal designer services and contract administration, from our office in Lincoln’s Inn Fields. That means the surveys at Stage 1, the consents at Stage 3, the party wall notices at Stage 4 and the contract administration at Stage 5 are all handled by people who know the building.
If you are planning a refurbishment of a commercial or listed building in central London, contact our team on 020 7391 7100 or email surveyor@fandt.com to talk through your project.
FAQs
How many RIBA stages are there?
There are eight RIBA stages, numbered 0 to 7. They are Strategic Definition, Preparation and Briefing, Concept Design, Spatial Coordination, Technical Design, Manufacturing and Construction, Handover and Use.
What RIBA stage is the planning application submitted at?
The planning application is normally submitted at the end of Stage 3, Spatial Coordination, once the architecture, structure and services have been coordinated. For listed buildings, the listed building consent application usually goes in at the same time.
What is RIBA Stage 4?
Stage 4 is Technical Design. The design team prepares the detailed drawings, specifications and schedules needed to build the project, and on a traditional contract these are used to tender the works. The Building Regulations application is also made at this stage.
What is the difference between RIBA Stage 3 and Stage 4?
Stage 3 coordinates the design so it is ready for planning. Stage 4 develops that coordinated design into the technical information a contractor needs to price and build it.
Do I have to follow the RIBA stages?
No. The RIBA Plan of Work is a framework, not a legal requirement or a contract. Most architects and consultants use it because it gives the client and the whole team a shared way of describing where a project is and what should happen next.
Can RIBA stages overlap?
Yes. RIBA acknowledges that some stages overlap depending on the procurement route. Technical design and construction often overlap, particularly on design and build contracts and on refurbishments where some design decisions can only be made once the building is opened up.
How are architect fees charged across the RIBA stages?
Fees are commonly set out stage by stage, so you know what each stage costs and can pause between stages. The split depends on the project and the scope of the appointment, so ask for a stage-by-stage fee proposal before you appoint.